RSS

Posts Tagged ‘New York City’

Construction Update: Shepard Hall Original Entry Wall Fully Revealed

Thursday, September 17th, 2009

Along with the recently unearthed entry stairs a major portion of the original entry wall has been unearthed. Following inspection, the team is now evaluating how this remnant of the original entry can be incorporated into the reconstruction. The wall, constructed of Manhattan schist likely from the building site, was buried under fill during a mid-twentieth century alteration. As part of the reconstruction efforts to the entire building, a new entry in keeping with George Post’s original entry is being created. Stay tuned for continued updates from the field.

Shepard-Schist-Wall

Carl Stein: Preserving the Past, Building for the Future – City College

Monday, September 14th, 2009

Carl Stein is interviewed about the history and preservation efforts by elemental at Shepard Hall as part of the College’s Centennial celebration

Follow Elemental on Facebook & Twitter

Tuesday, September 1st, 2009

Elemental is on Facebook. Become a fan and keep up with our latest news, construction updates and general interest postings. We can also be followed on Twitter as elementalnyc.

Elemental commissioned to design new Midtown Medical facility

Saturday, June 13th, 2009

Elemental has been selected to complete the interior design and planning of a new 16,000 sf medical facility in Midtown Manhattan. The charge is to create a multi-tenant facility that is both modern, inviting and sensitive to the patient experience. Stay tuned for design and construction updates.

Construction Update: Shepard Hall Reconstruction Kicks-off

Thursday, May 28th, 2009

The 9th & 10th phases of the award-winning historic reconstruction of Shepard Hall at the City College of New York has officially begun. The project, which includes the replacement of nearly 8,000 pieces of failing terra cotta sculpture ornament with new glass-fiber reinforced concrete replacement units and a new main entrance to the building, is expected to be complete by May 2011. Stay tuned for regular construction progress updates from the field.

Shepard Apse

Tom Abraham & Carl Stein lecture at Baruch College

Wednesday, October 22nd, 2008

Elemental co-founders Carl Stein, FAIA & Tom Abraham, AIA are invited to lecture at Baruch College. The lecture entitled ‘Sustainability and New York City’ discusses why New York is one of the ‘greenest’ developed areas in the world.

The Great Hall at Open House NY

Saturday, October 4th, 2008

Elemental co-founders Carl Stein, FAIA & Tom Abraham, AIA give tours of the Great Hall at Shepard Hall, The City College of New York, as part of the annual Open House New York Architectural Tour program. The $12.8 million restoration of the 14,000 sf Great Hall includes the introduction of modern, state of the art acoustic and lighting systems which make the grand assembly space available for a wide variety of programs ranging from lectures and musical performances to commercial film and television shoots. The work also included the refurbishment of twelve sixty-foot stained glass windows, extensive repair of the elaborate decorative plaster and woodwork, and newly designed limestone floor and new control booth. The restoration was the recipient of the Lucy G. Moses Award from the New York Landmarks Conservancy, one of the nation’s most prestigious preservation awards.

The Great Hall at CCNY

John Barboni featured in D Magazine Italy

Saturday, March 22nd, 2008

John Barboni, co-founder of elemental, is selected by fashion photographer Simon Burstall for a feature profiling downtown New York City’s creative force.